Stargate Norway

Narvik, Norway

ECM Conflict Score50/100 · Moderate
StatusPlanned
Capacity midpoint375 MW
Water scenario0 ML/day
PUE · ECM scenario1.18
ConfidenceA
Location precisioncity
Data classreported+modeled
Last reviewed11 Aug 2026
ECM MODEL

Score decomposition

Grid constraint55/100
Water stress30/100
Energy supply risk30/100
Permitting / social conflict55/100
Pipeline pressure88/100

Weighted result ≈ 50/100 · published dataset score 50/100

ANALYST NOTE

Interpretation

OpenAI reports 230 MW planned capacity with ambition for an additional 290 MW. The displayed 375 MW is the midpoint used by the ECM base scenario.

Acityreported+modeled

Source & modeling note

OpenAI — Introducing Stargate Norway

OpenAI — Introducing Stargate Norway ↗

OpenAI reports 230 MW planned capacity with ambition for an additional 290 MW. The displayed 375 MW is the midpoint used by the ECM base scenario.

Revision history

V3 record migration

Record migrated to the V3 schema with explicit location precision, confidence, data class and decomposed ECM score. Underlying source note retained.